{"id":3154,"date":"2025-04-16T14:18:00","date_gmt":"2025-04-16T12:18:00","guid":{"rendered":"https:\/\/bc-wind.pl\/?p=3154"},"modified":"2025-05-22T15:58:23","modified_gmt":"2025-05-22T13:58:23","slug":"rozmowy-przed-budowa-spotkanie-w-gminie-choczewo","status":"publish","type":"post","link":"https:\/\/bc-wind.pl\/en\/rozmowy-przed-budowa-spotkanie-w-gminie-choczewo\/","title":{"rendered":"Pre-construction Talks \u2013 Meeting in the Choczewo Municipality"},"content":{"rendered":"\n<p><strong>Every investment begins with dialogue. In mid-April, representatives of Ocean Winds and P&amp;Q \u2013 the general contractor for the onshore electrical substation for the BC-Wind project \u2013 visited the Choczewo Municipality. The purpose of the meeting was to present the project\u2019s assumptions and discuss the key stages of building the grid connection infrastructure within the municipality.<\/strong><\/p>\n\n\n\n<p>Participants from the Choczewo Municipality included:<br>\u2022 Jaros\u0142aw Bach \u2013 Mayor of the Municipality<br>\u2022 Bart\u0142omiej Pob\u0142ocki \u2013 Mayor\u2019s Representative for Strategic Investments<br>\u2022 Bo\u017cena Szczypior \u2013 Municipal Secretary<br>as well as representatives of Ocean Winds and P&amp;Q.<br><\/p>\n\n\n\n<p>The discussion covered the scope of work related to the construction of the onshore electrical substation, which will play a crucial role in integrating the BC-Wind offshore wind farm with the national power grid. The construction of the onshore infrastructure is planned for 2026, with the first electricity from the BC-Wind farm expected to flow in 2028.<br>The meeting continued the efforts initiated by the signing of the contract with P&amp;Q, which took place last week. <\/p>\n\n\n\n<p><\/p>\n\n\n\n<p>More information about the agreement can be found in the article:<br><a href=\"https:\/\/bc-wind.pl\/en\/ocean-winds-and-pq-sign-an-agreement-for-the-design-construction-installation-and-commissioning-of-the-onshore-power-substation-for-the-bc-wind-project-in-poland\/\" data-type=\"link\" data-id=\"https:\/\/bc-wind.pl\/en\/ocean-winds-and-pq-sign-an-agreement-for-the-design-construction-installation-and-commissioning-of-the-onshore-power-substation-for-the-bc-wind-project-in-poland\/\">Ocean Winds and P&amp;Q sign an agreement for the design, construction, installation, and commissioning of the onshore power substation for the BC-Wind project in Poland<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"644\" height=\"478\" src=\"\/wp-content\/uploads\/2025\/05\/Capture.jpg\" alt=\"\" class=\"wp-image-3155\" srcset=\"\/wp-content\/uploads\/2025\/05\/Capture.jpg 644w, \/wp-content\/uploads\/2025\/05\/Capture-300x223.jpg 300w\" sizes=\"auto, (max-width: 644px) 100vw, 644px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Every investment begins with dialogue. In mid-April, representatives of Ocean Winds and P&amp;Q \u2013 the general contractor for the onshore electrical substation for the BC-Wind project \u2013 visited the Choczewo Municipality. The purpose of the meeting was to present the project\u2019s assumptions and discuss the key stages of building the grid connection infrastructure within the &hellip; <a href=\"https:\/\/bc-wind.pl\/en\/rozmowy-przed-budowa-spotkanie-w-gminie-choczewo\/\">Continued<\/a><\/p>\n","protected":false},"author":3,"featured_media":3155,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[5],"tags":[],"class_list":["post-3154","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/bc-wind.pl\/en\/wp-json\/wp\/v2\/posts\/3154","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bc-wind.pl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bc-wind.pl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bc-wind.pl\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/bc-wind.pl\/en\/wp-json\/wp\/v2\/comments?post=3154"}],"version-history":[{"count":2,"href":"https:\/\/bc-wind.pl\/en\/wp-json\/wp\/v2\/posts\/3154\/revisions"}],"predecessor-version":[{"id":3161,"href":"https:\/\/bc-wind.pl\/en\/wp-json\/wp\/v2\/posts\/3154\/revisions\/3161"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bc-wind.pl\/en\/wp-json\/wp\/v2\/media\/3155"}],"wp:attachment":[{"href":"https:\/\/bc-wind.pl\/en\/wp-json\/wp\/v2\/media?parent=3154"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bc-wind.pl\/en\/wp-json\/wp\/v2\/categories?post=3154"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bc-wind.pl\/en\/wp-json\/wp\/v2\/tags?post=3154"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}