{"id":3888,"date":"2026-09-10T10:00:00","date_gmt":"2026-09-10T08:00:00","guid":{"rendered":"https:\/\/bc-wind.pl\/?p=3888"},"modified":"2026-09-10T09:30:47","modified_gmt":"2026-09-10T07:30:47","slug":"ocean-winds-begins-leasing-swinoujscie-offshore-terminal-for-the-bc-wind-project-in-poland","status":"publish","type":"post","link":"https:\/\/bc-wind.pl\/en\/ocean-winds-begins-leasing-swinoujscie-offshore-terminal-for-the-bc-wind-project-in-poland\/","title":{"rendered":"Ocean Winds begins leasing \u015awinouj\u015bcie Offshore Terminal for the BC-Wind project in Poland"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Warsaw, 10 September 2026: Ocean Winds is commencing the lease of \u015awinouj\u015bcie Offshore Terminal for the development of the BC-Wind offshore wind farm. The installation terminal in \u015awinouj\u015bcie will play an important role in the preparation, transportation and installation of foundations and transition pieces. Ocean Winds will be the first tenant to make full use of the terminal\u2019s potential and the entire available area for the construction of BC-Wind.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The lease of the terminal began in early September 2026 and will continue until the fourth quarter of 2027. During this period, \u015awinouj\u015bcie Offshore Terminal will be one of the key logistics and installation facilities supporting the BC-Wind project and the construction of the offshore wind farm.<br>\u015awinouj\u015bcie Offshore Terminal was designed to support offshore wind projects in the region. Its infrastructure enables the handling of vessels used in the construction of offshore wind farms, as well as the logistics of components, including their unloading, storage, preparation and loading onto installation vessels.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"\/wp-content\/uploads\/2026\/09\/Zdjecie_srodek_1-1024x768.jpg\" alt=\"\" class=\"wp-image-3878\" srcset=\"\/wp-content\/uploads\/2026\/09\/Zdjecie_srodek_1-1024x768.jpg 1024w, \/wp-content\/uploads\/2026\/09\/Zdjecie_srodek_1-300x225.jpg 300w, \/wp-content\/uploads\/2026\/09\/Zdjecie_srodek_1-768x576.jpg 768w, \/wp-content\/uploads\/2026\/09\/Zdjecie_srodek_1-1536x1152.jpg 1536w, \/wp-content\/uploads\/2026\/09\/Zdjecie_srodek_1-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pete Geddes, BC-Wind Project Director, Ocean Winds, said:<\/strong> \u201dThe start of the lease of \u015awinouj\u015bcie Offshore Terminal is an important milestone in the delivery of the BC-Wind project. The terminal is well positioned in relation to our project area and will provide important support for the next stage of works. We are now focusing on preparing the terminal to receive the foundations and ensuring a smooth start to offshore installation works.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Sebastian Wionczek, Managing Director, \u015awinouj\u015bcie Offshore Terminal, commented:<\/strong> \u201cStarting our cooperation with Ocean Winds on the BC-Wind project marks an important milestone for \u015awinouj\u015bcie Offshore Terminal and ORLEN Neptun. The terminal is demonstrating its readiness to handle the most demanding stages of offshore wind farm construction, while also enabling us to develop capabilities that will be critical to the delivery of the ORLEN Group\u2019s future projects in the Baltic Sea.<br>It is also a practical example of how Polish port infrastructure and local capabilities can support the development of offshore wind in Poland. Ultimately, the terminal will serve as a strategic hub for the ORLEN Group\u2019s second-phase offshore wind projects \u2013 Baltic East and Baltic West.\u201d<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"\/wp-content\/uploads\/2026\/09\/Zdjecie_srodek_2-1024x768.jpg\" alt=\"\" class=\"wp-image-3880\" srcset=\"\/wp-content\/uploads\/2026\/09\/Zdjecie_srodek_2-1024x768.jpg 1024w, \/wp-content\/uploads\/2026\/09\/Zdjecie_srodek_2-300x225.jpg 300w, \/wp-content\/uploads\/2026\/09\/Zdjecie_srodek_2-768x576.jpg 768w, \/wp-content\/uploads\/2026\/09\/Zdjecie_srodek_2-1536x1152.jpg 1536w, \/wp-content\/uploads\/2026\/09\/Zdjecie_srodek_2-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Installation works related to the BC-Wind foundations will be carried out using specialised installation vessels and precision positioning systems. Monopile installation is planned for the end of the first and beginning of the second quarter of 2027, while the installation of the transition pieces is scheduled for the third and fourth quarters of 2027.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Read more in full communicate<a href=\"\/wp-content\/uploads\/2026\/09\/2026.09.10-EN-Ocean-Winds-begins-leasing-Swinoujscie-Offshore-Terminal-for-the-BC-Wind-project-in-Poland_final.pdf\" data-type=\"attachment\" data-id=\"3882\"> >>LINK&lt;&lt;<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Warsaw, 10 September 2026: Ocean Winds is commencing the lease of \u015awinouj\u015bcie Offshore Terminal for the development of the BC-Wind offshore wind farm. The installation terminal in \u015awinouj\u015bcie will play an important role in the preparation, transportation and installation of foundations and transition pieces. Ocean Winds will be the first tenant to make full use &hellip; <a href=\"https:\/\/bc-wind.pl\/en\/ocean-winds-begins-leasing-swinoujscie-offshore-terminal-for-the-bc-wind-project-in-poland\/\">Continued<\/a><\/p>\n","protected":false},"author":2,"featured_media":3886,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[5],"tags":[],"class_list":["post-3888","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/bc-wind.pl\/en\/wp-json\/wp\/v2\/posts\/3888","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bc-wind.pl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bc-wind.pl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bc-wind.pl\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/bc-wind.pl\/en\/wp-json\/wp\/v2\/comments?post=3888"}],"version-history":[{"count":1,"href":"https:\/\/bc-wind.pl\/en\/wp-json\/wp\/v2\/posts\/3888\/revisions"}],"predecessor-version":[{"id":3889,"href":"https:\/\/bc-wind.pl\/en\/wp-json\/wp\/v2\/posts\/3888\/revisions\/3889"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bc-wind.pl\/en\/wp-json\/wp\/v2\/media\/3886"}],"wp:attachment":[{"href":"https:\/\/bc-wind.pl\/en\/wp-json\/wp\/v2\/media?parent=3888"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bc-wind.pl\/en\/wp-json\/wp\/v2\/categories?post=3888"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bc-wind.pl\/en\/wp-json\/wp\/v2\/tags?post=3888"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}